Real-Time Shop Floor
β‘ Live Floor Status
Clocked In: 0
Active Jobs: 0
Operator
My Active Jobs
Priority queue
Jobs Needing Attention
Capacity
Workcenter Load
Quality
Scrap Rate
Inventory
Low Stock Alerts
0 work orders selected
Set status:
| WO | Part / Customer | Status | Due | Qty | Material | Route | Actual | Cost Est. | Actions |
|---|
Inactive
Order History
| WO | Customer / Part | Completed | Qty | Actual | Label / Quality | Status / Shipping | Open | Admin |
|---|
New Quote
Customer Cards
New Customer
Production Planning & Operations Schedule
Scheduled Work
Machine queues
Operations by Workcenter
Stock
Materials
Requirements & Backlog Logs
BOM Demand, Consumption & Write-Off History
Requirements & Backlog Logs
BOM Demand, Consumption & Write-Off History
Requirements
BOM Demand
Backlog
Material Consumption History
Backlog
Material Write-Off History
Quality & Compliance Hub
ISO 9001 Β· AQAP 2110 Β· EN 9100
π Measuring Equipment
ISO 9001 Β§7.1.5
β οΈ 8D NCR & CAPA
AQAP 2110 / ISO 9001
π AS9102 FAI Inspection
EN 9100 / AS9102
π Certificate of Conformance
Defense / Aerospace
Metrology & Inspection Equipment
Measuring Equipment & Calibration Registry
0 Instruments
0 In Service
| Tool Code | Instrument Name & Type | Serial / Mfr | Shop Location | Accuracy | Last Calibrated | Next Due | Status | Actions |
|---|---|---|---|---|---|---|---|---|
| Loading measuring instruments⦠| ||||||||
Quote basis
Workcenter Rates
Quote basis
Workcenter Rates
Estimator
Selected Job Cost
Estimator
Selected Job Cost
Traceability
Operator Hours Report
Traceability
Operator Hours Report
Output
Weekly Parts Output
Output
Weekly Parts Output
Efficiency
Material Usage — Actual vs Planned
Efficiency
Material Usage — Actual vs Planned
Job P&L
Job Costing Summary — Completed Orders
Job P&L
Job Costing Summary — Completed Orders
Profitability
Cost by Customer — Top 20
Profitability
Cost by Customer — Top 20
Capacity
Work Center Load — Next 4 Weeks
Capacity
Work Center Load — Next 4 Weeks
Efficiency
OEE — Overall Equipment Effectiveness
Efficiency
OEE — Overall Equipment Effectiveness
Demand
Customer Orders
Demand
Customer Orders
ISO 9001 Β· Β§7.1.5 Quality Equipment Measuring Tools & Calibration Registry Track calipers, micrometers, CMM, height gauges, tolerance verification & calibration due dates
0 Instruments
0 In Service
| Tool Code | Instrument Name & Type | Serial / Mfr | Location | Accuracy | Last Calibrated | Next Due | Status | Actions |
|---|---|---|---|---|---|---|---|---|
| Loading measuring instruments⦠| ||||||||